paper recycling plant construction

Customer's problems:

  1. Item E had two 90 elbows which was required for safety issue, which made the hopper even smaller. 
  2. The forklift hopper was too small.

Solution:

  1. Extend four legs 29”.
  2. Extend min 6” on right side of base plates.
  3. Extend min 6”, form and pour concrete, Extend anchor bolts on left and remove the ones on right and install new epoxy anchor bolts.
  4. Modify both inlet and outlet piping 8”, 35” deduction and addition.
  5. Extend on straight spool, so from valve we have min 24”.
  6. Modify the water piping.
  7. Re-rout 6” line to make room for 8” item D.

The Process:


paper recycling plant construction Before

Before

paper recycling plant construction After

After